top of page

VETERANS MEMORIAL BUILDING/YMCA - PHASE 1

REDWOOD CITY, CALIFORNIA

Project is under construction, as of July 2021. 

 

My role: Pre-Design and Design Development

 

Project under Principal/CEO Clarence Mamuyac

The Veterans Memorial Building and YMCA are being built in phases. Phase 1 of the project started construction in July 2021. 
Due to the community's concern around the potential increase in traffic, a Traffic Calming scope of work became a high priority.

js rwc_SITE DIAGRAM-page-001.jpg
Red Morton Park-02.jpg

MADISON AVE.

NEVADA ST.

EXISTING VETERANS MEMORIAL BUILDING

EXISTING SITE

The building site is located on the north side of Red Morton Park. The park has sports fields, walking paths, a community center and a children's playground. The surrounding streets contain single family residences. 

 

SITE PLAN FROM SWA LOW.jpg

P

YMCA

VETERANS MEMORIAL BUILDING

P

PROPOSED SITE

The goal is to maximize park space, while meeting the parking needs of the new programs. To do this the green space along Madison will be preserved. The parking lots are located on the perimeter of the site and a new pedestrian promenade will take the place of Nevada St.

BUILDING PROGRAMS

FIRST FLOOR WORKSHOP 3 LOW.jpg
SECOND FLOOR WORKSHOP 3 LOW.jpg

THE VETERANS MEMORIAL BUILDING IS PROPOSED TO BE AN

ALL ELECTRIC, PASSIVELY COOLED BUILDING.

MADISON ELEVATION PLANNING APP.jpg

MADISON AVE. ELEVATION

PROMENADE ELEVATION PLANNIG APP.jpg

PROMENADE ELEVATION

Sections for Resiliency Meeting_Long.jpg
Lobby Section double skin flipped.jpg
Sections for Resiliency Meeting_Short.jp
21_GYM SOUTH PROMENADE_2018-1106_Small.j

PROMENADE FROM PARK

22_MADISON & NEVADA PROMENADE_2018-11-02

ENTRY FROM MADISON AVE.

03_VMB LOBBY & PYLONS_20181016v1_redwood

LOBBY

My Role, the Building:

Prepared diagrams for community workshops and led design charattes, presented concepts and answered questions at each workshop.

Researched and specified building materials to meet the building code and budget requirements.

 

Selected finishes and documented interior details.


Coordinated the site information with civil and landscape consultants.

Led efforts to ensure the project has a minimal impact on the environment and coordinated information with the LEED Consultant.

My Role, Traffic Calming:

Organized community workshops and mock-up events.

Presented concepts and answered questions at city council meetings and community workshops.

 

Coordinated information between consultants and the city of Redwood City.

Examined the parking and traffic issues of the neighborhood.

Issued a parking assessment based on previous data to predict the number of parking spaces needed for the new program.


 

bottom of page